The project at East Palomar Street in Chula Vista, CA was 133,000 SF of pervious concrete and 21,000 SF of Lithocrete.

Crews at T.B. Penick worked with CalTrans’s own mix design for pervious versus the Penick mix they were used to. Site issues made Telebelt usage a must, along with occasionally having trucks stuck in the subgrade bed.